Electrical maintenance & power distribution
HT/LT substations, transformers, panels, earthing and lighting.
- Thermography & IR scanning
- Breaker testing & relay coordination
- Power quality monitoring
HVAC & air-conditioning
Chillers, cooling towers, AHUs, VRF, split and precision units.
- Chiller plant optimisation
- Filter & coil hygiene
- IAQ monitoring
Plumbing & water management
Domestic water, STP/WTP, pumps, drainage and water features.
- Water quality logs
- Leak detection
- Pump efficiency checks
DG sets, UPS & critical power
Standby generation and uninterrupted power for critical loads.
- Load-bank testing
- Battery health monitoring
- Fuel management
Fire & life safety systems
Detection, alarm, suppression, hydrants and sprinklers.
- Periodic functional testing
- Mock drills support
- Documentation for statutory inspections
Lifts & escalators
Coordination of OEM maintenance, entrapment response and audits.
- OEM contract management
- Breakdown analysis
- Rescue drills
Building Management Systems
Monitoring and control of HVAC, lighting, energy and alarms.
- Point audits & trend analysis
- Alarm rationalisation
- Schedule optimisation
Civil repairs & infrastructure
Carpentry, masonry, painting, waterproofing and façade upkeep.
- Snag & fit-out repairs
- Roof & waterproofing
- Signage & fixtures
Energy management & sustainability
Metering, audits, retrofits and performance tracking.
- Energy baselining
- LED & VFD retrofits
- Monthly energy reports
Planned, reactive and predictive — in the right balance
We set maintenance strategy by asset criticality. Critical assets get condition-based and predictive regimes; non-critical assets are maintained cost-effectively.
- Asset criticality matrix and risk register
- OEM- and statute-aligned PPM schedules
- Emergency response with defined P1–P4 priorities
- Root-cause analysis on repeat failures
Priority framework Sample SLA
| Priority | Response | Resolution |
|---|---|---|
| P1 Emergency | 15 min | 4 hrs |
| P2 High | 30 min | 8 hrs |
| P3 Medium | 2 hrs | 24 hrs |
| P4 Low | 4 hrs | 72 hrs |
Final SLAs are agreed per contract.
Ready to raise the standard of your facility operations?
Share your portfolio details and our solutions team will prepare a scoped proposal with transition plan, SLA framework and commercial model.